type Activity
Label Develop Tanker Flow
Documentation
Reference Technical Report DRIY-TR-1994-001 HQ ACC/DRIY TBM Architecture Project 25 January 1994 TBM C4I, AOC page 10,3
Aliases
Definition As the refueling requests are finalized, the tanker planning cell must develop the flow of refueling missions (both receivers and tankers) throughout the ATO period. The Duty Officer must schedule flights into the refueling tracks based on mission requirements, plan the offload amount and time, allow for spacing after each refueling (45 minutes between each mission), and schedule tanker sequencing to cover the missions.