type | Activity |
Label | Develop Master Air Attack Plan |
Documentation | |
Reference | Technical Report DRIY-TR-1994-001 HQ ACC/DRIY TBM Architecture Project 25 January 1994; TBM C4I, AOC page 6 |
Aliases | MAAP |
Definition | This activity is the fist step in the actual mission planning process. The planners review the targets to be struck during the next ATO period, group those targets based on geographsical location or mission requirements, determine the available sorties, and identify support requiremtents. This results in a rough flow of missions throughout the sortie period. |