type | Activity |
Label | Develop Tanker Flow |
Documentation | |
Reference | Technical Report DRIY-TR-1994-001 HQ ACC/DRIY TBM Architecture Project 25 January 1994 TBM C4I, AOC page 10,3 |
Aliases | |
Definition | As the refueling requests are finalized, the tanker planning cell must develop the flow of refueling missions (both receivers and tankers) throughout the ATO period. The Duty Officer must schedule flights into the refueling tracks based on mission requirements, plan the offload amount and time, allow for spacing after each refueling (45 minutes between each mission), and schedule tanker sequencing to cover the missions. |